Fermín Izquierdo 7Fermín Izquierdo 7

Intro
La Idea

The Idea

Fermín Izquierdo 7 is a residential development featuring exceptional architecture and the highest energy efficiency rating, strategically located in the heart of Madrid, specifically in the Tetuán District—currently the city’s most rapidly transforming area. The development is situated very close to Plaza Castilla, Plaza de Cuzco, and the Cinco Torres, including Torre Caleido – IE University. Its location next to Madrid Nuevo Norte, “the most significant urban transformation project in Madrid and one of the most important in Europe,” makes Fermín Izquierdo 7 a highly attractive project with maximum short- and medium-term profitability for investors.

Architecture

Fermín Izquierdo is part of a series of projects that address the need for new quality housing in former industrial areas of the city of Madrid. Located on a quiet street in the Tetuán district, next to the winding Paseo de la Dirección, the new building, with its orderly composition of facade openings, gives the entire structure a renewed character. The large, square-proportioned windows contrast with the simplicity of the rendered facade. In contrast to spectacle-driven architecture, this new building proposes a refined rationalist style, based on spacious interiors and attention to construction details.

The development of 9 residential units, with storage rooms, garage, and swimming pool, directly responds to the real needs of neighborhood life. Through the generous entrance portico, accessible from the street, one reaches the lobby that connects the various residential floors.

Passing through this portico leads to a large, well-proportioned inner garden. In this way, the through-apartments orient their living spaces toward this interior oasis, taking full advantage of the large light well—so characteristic of Madrid—whose southern orientation ensures proper lighting of the living areas. The studio apartments on the first and second floors open entirely to the north facade, thanks to the large central window.

Finally, the interior finishes reflect a construction tradition rooted in precision, quality, and low maintenance. The continuous gray terrazzo floors, together with traditional renderings and round steel bar railings, establish a unique identity that also carries forward the care and simplicity of the building’s construction details.

El Proyecto

The Project

Fermín Izquierdo 7 is a project with distinctive architecture, featuring 9 residences with storage rooms, a spacious south-facing garden with a swimming pool, a multipurpose communal room, parking spaces, and a bicycle area.

The homes are available in three layouts—studios, one-bedroom, and two-bedroom units—and include large windows with thermal break technology and terraces that provide abundant natural light. The construction prioritizes design and comfort, using high-quality materials that also ensure maximum energy efficiency. The homes feature hot and cold climate control through underfloor heating powered by aerothermal energyKitchens are delivered fully furnished and equipped with top-brand integrated appliances. Bathrooms come fully equipped, and the closets are fitted and lined.

Location

The Neighbourhood

Tetuán is a centrally located district in Madrid currently undergoing a major transformation thanks to its excellent location, vibrant commercial activity, and strong neighborhood spirit. These qualities are attracting a growing number of families, young people, and professionals looking to live and work in a prime area at an attractive price. In fact, Tetuán is currently one of the most profitable districts in central Madrid (El Confidencial) and the most promising in the capital (Expansión).

Located in the Valdeacederas neighborhood, near the commercial axis of Bravo Murillo Street, Avenida de Asturias, and Plaza Castilla, Fermín Izquierdo 7 sits in one of the most established residential areas of the district.

The area offers a wide range of commercial options, a lively Sunday market, and all necessary services. Sinesio Delgado Park is just a 2-minute walk from the development, which also benefits from nearby green spaces such as Dehesa de la Villa and Cuarto Depósito Park (Plaza Castilla).

Proximity to IE University, the Fundación Canal & Fundación Canal Sala 212, Santiago Bernabéu Stadium, and Chamartín–Clara Campoamor Station enhances the appeal of our surroundings, making this development an outstanding opportunity for both end buyers and real estate investors.

P Parking

Private indoor parking within the property


Acceso Access

M-30 (West) and A-6 - 9 min
M-30 (North) and A-1 - 9 min

Acceso Metro

Ventilla: 9
Valdeacederas: 1

Bus Buses

Lines 49 and N22 - 2-minute walk
Line 177 - 3-minute walk
Plaza Castilla transport hub (Interchange station)

Estación Tren Train Station

Chamartín Clara Campoamor Station (high-speed AVE) - 22 minutes:
Caminando 4 min. + Bus 49 + Caminando 8 min.

Aeropuerto Airport

By car: 16 minutes
By public transport: 49 minutes

Gallery

Galería
Galería
Galería
Galería
Galería
Galería
Galería
Galería
Galería
Galería
Galería

Floor Plans

RESIDENTIAL UNITS

  • GROUND FLOOR
  • 1A
  • 1B
  • 1C
  • 2A
  • 2B
  • 2C
  • 3A
  • 3B

Common Areas

  • Ground Floor
  • Basement Level

Prices

Unit Floor Storage room Terrace / Patio / Porch Surface (m2) Price (incl. storage room) Launch offer (*) You save
Total built
surface
Terrace Total
Bajo Ground floor Nbr. 1 Porch & patio 74,65 18,00 92,65 432.000 € 398.000 € 34.000 €
1A First floor Nbr. 2 Terrace 78,64 78,64 432.000 € 398.000 € 34.000 €
1B First floor Nbr. 3 - 53,84 53,84 320.000 € 296.000 € 24.000 €
1C First floor Nbr. 4 Terrace 79,87 79,87 459.000 € 422.000 € 37.000 €
2A Second floor Nbr. 5 Terrace 79,61 79,61 459.000 € 422.000 € 37.000 €
2B Second floor Nbr. 6 - 53,30 53,30 334.000 € 308.000 € 26.000 €
2C Second floor Nbr. 7 Terrace 79,66 79,66 480.000 € 442.000 € 38.000 €
3A Third floor (penthouse) Nbr. 8 Terrace 77,37 21,17 98,54 572.000 € 526.000 € 46.000 €
3B Third floor (penthouse) Nbr. 9 Terrace 72,32 15,49 87,81 520.000 € 479.000 € 41.000 €
Parking space Nbr.1 29.500 €
Parking space Nbr.2 29.500 €
Parking space Nbr.3 29.500 €
Parking space Nbr.4 29.500 €

Notes:
Surfaces may be subject to modifications imposed by the Administration or by technical requirements.
VAT 10% not included in the prices
(*) The special introductory offer price will be valid only for the first three (3) home purchase contracts. Once the first three (3) homes have been sold, the non-offer price will apply.
Each home is delivered with a storage room, included in the price.
The Spanish version of this document prevails over the English version.

Quality report

Exterior enclosures

Main façade in thermo clay with off-white mass plaster coating.

Rear facade in thermo clay with off-white mass plaster coating.

On both facades, a laminated plaster backing with mineral wool thermal insulation will be installed inside.

The entrance doors (access door to the "porch" and garage door) will be made of micro-perforated corrugated or corrugated sheet metal in an aluminum color to be defined on metal frames.

The party walls will be finished with off-white mass plaster cladding.

The separation between the access ramp to the garage and the building's common areas will consist of a lattice of micro-perforated corrugated or corrugated sheet metal in an aluminum color to be defined on metal frames.

Deck

The roof will be sloping, with metal trays, made of zinc or similar, in a textured anthracite gray color.

The exterior aerothermal units will be located on the ridge, and the floor will have the same finish as the penthouse terraces.

Exterior carpentry

Hinged, thermally broken aluminum exterior carpentry with inward opening, swing or tilt-and-turn. Lacquered in a textured anthracite gray.

Double glazing with air chamber and laminated glass.

Cortizo , Reynaers or similar brand .

The drip edges will be made of 4mm thick aluminum sheet metal, the same color as the woodwork.

Interior divisions

Partitions between homes and interior partition walls made of self-supporting laminated plasterboard with acoustic insulation.

Divisions between homes and common areas reinforced with self-supporting laminated plasterboard cladding with acoustic insulation.

Complying with acoustic conditions according to CTE DB-HR.

Note: The Spanish version of this document prevails over the English version.

Interior carpentry

Solid 4cm-thick wooden swing doors, lacquered in off-white with a smooth design. With steel or matte chrome hardware.

Straight-edged door perimeter frame, 7 cm wide and 12 mm thick, lacquered in white.

Water-repellent wooden skirting board lacquered in off-white, 10 cm high, with a straight edge and a smooth design.

Floor-to-ceiling wardrobes with lacquered wood hinged doors, a smooth design, and floor-to-ceiling finger-grip. Wardrobe interiors in plastic laminate.

Bathroom screens made of tempered safety glass with sliding or hinged doors.

Kitchen cabinet and cupboard fronts in laminated Touch laminate or lacquered in matte green or other colors.

Pavements

Interior of homes in continuous tiles of fine-grained terrazzo or similar.

The basement community room will be made of the same material.

The interior of the porch will also be made of fine-grain terrazzo tiles or similar, with an exteri

The steps of the porch staircase will be made of the same material as the porch floor.

The entrance will be tiled with fine-grain terrazzo or similar, with an exterior finish, the same as the staircase. The same finish will be used for the attic terraces and rear balconies.

The pool area (curb) will be covered with light-colored limestone and a honed or similar finish.

The rest of the communal patio area will be grass.

Walls

Interior of homes in smooth, washable white plastic paint.

Tiled bathrooms in wet areas with mirrors and smooth, washable white plastic paint on the remaining walls.

On the walls of the porch: off-white mass plaster.

The stair railings will be made of 10mm diameter round steel and the handrails will be made of 30mm round steel tube.

Roofs

Continuous false ceiling made of laminated plasterboard throughout the interior, finished with smooth plastic paint.

Note: The Spanish version of this document prevails over the English version.

Plumbing and sanitation

Unitary sanitation installation with small interior drainage network and PVC downpipes.

Plumbing installation with interior network in multi-layer conduit.

Water point on the penthouse terraces and on the ground floor terrace.

Air conditioning and hot water

hygro-regulating extraction outlets.

Individual air conditioning with aerothermal heating and cooling via underfloor heating, with a programmable thermostat and ridge units.

Community aerothermal ACS with machines on the roof and storage in the basement, with a return circuit.

Electricity and telecommunications

Installation according to REBT.

Electrical mechanisms inside homes of the Jung LS 990 or similar type.

Terrestrial TV and FM signal reception in the building, with TV/FM connection points in all rooms and bedrooms. Indoor telecommunications installation in compliance with regulations.

Outdoor power outlet and light points in the communal patio and on the ground floor terrace.

Pool

Gresite Piscinas brand mosaic pool, emerald green mist model or similar, gloss finish and dimensions 2.5x2.5cm or similar.

Equipment

Furnished kitchen with appliances including an induction cooktop, extractor hood, microwave, washer-dryer, dishwasher, and refrigerator integrated into the unit. Countertops made of synthetic stone, porcelain, or similar.

Bathrooms with Roca or similar sanitary fixtures. Vanity unit with sink and single-lever faucet. Shower trays with single-lever thermostatic faucets.

Note: The Spanish version of this document prevails over the English version.

Contact

Marketed by

ATOM

Financed by

Sabadell

Developed by

HOUSING DEVELOPMENTS ONE, S.L.
C/ Miguel Ángel 4, Bajo 10 - 28010 Madrid

Telephone

+34 670 89 16 26